Set production capacity
You can set the production capacity standards for your company.
If you have multiple production facilities, set the production capacity for each facility.
To set production capacity
-
Open the Production Capacity (CSPC) page.
- Select Utilities > Company Setup > Module Setup > Production Capacity.
Or
- Search for CSPC or Production Capacity in the Navigation box and then select Production Capacity.
The Production Capacity (CSPC) page appears.
-
Make the necessary changes.
-
Set shift information:
-
In the Shifts Per Day box, enter the number of shifts to operate per day.
-
In the Standard Minutes Per Shift box, enter the number of minutes in a normal shift.
-
In the Maximum Minutes Per Shift box, enter the maximum number of minutes per shift.
-
In the Shift One Start Time, Shift Two Start Time, and Shift Three Start Time boxes, enter the start time for each shift.
-
-
Set scheduling rules:
-
In the Schedule Through the Next (Days) box, enter the number of days through which to run a schedule.
-
If required,in the Default Queue Allowance As % of Avg Queue Time box,enter the percent of average queue time to schedule.
-
-
In Maximum Simultaneous Operations area, for each shift, enter the maximum number of operations that can run simultaneously in the entire plant during the shift.
-
On the Toolbar, click Save.