Procurement on-time delivery

Article • 4/27/2026 • 4 min read

Use the Procurement On-Time Delivery page to generate business analytics giving procurement on-time delivery by vendor and part number.

By default, generic filters are available to generate this report. You can use Advanced Filters to customize or expand your filter criteria.

This report does not include Advanced Filters feature.

To generate Procurement on-time delivery report

  1. Open the Procurement On-Time Delivery (BAPOTD) page.

    1. Select Executive Information System > Business Analytics > Production Business Analytics > Procurement On-Time Delivery.

    Or

    1. Search for BAPOTD in the Navigation box and then select Procurement On-Time Delivery.

    The Procurement On-Time Delivery (BAPOTD) page appears.

  2. In the Selection dropdown, select the information you want to view.

  3. In the Sort Order dropdown, select from the options on how to sort the report. The Sort Order list is populated based on the type of report selected in the Selection list.

  4. In the Layout area, select the layout in which you want to view the report.

    The Layout field is populated based on the type of report selected in the Selection field.

  5. In the Date Range area, specify the date range for the report to be generated. You can select the date in the From and To fields only if you select the Custom option in the Fill Dates area.

    The Date On field is populated based on the type of report selected in the Selection field.

    To include the entire time frame, leave the date fields blank.

    In the Fill Dates area, you can select from the predefined date ranges. They are:

  1. In the Sort Range area, specify the sort range.

    The Sort On field is populated based on the type of report selected in the Selection field.

    The available sort ranges are:

    • Single: Select this option to include only one item. Selecting this option enables the From field. Do one of the following:

      1. In the From field, enter the item reference.

      2. Click the lookup reference and select the sort item from the Lookup for From. Select the required sort item and click Select.

    • Range: Select this option to include a range of items to sort from. Selecting this option enables the From and To fields. Do one of the following:

      1. Type the first and last values of the range in the From and To fields.

      2. Click the lookup reference (if available) and select the sort item from the Lookup. Select the required sort item and click Select.

    • All: Select this to include all available items.

  2. On the Toolbar, click Run Report. The Please Select dialog box appears.

    Select Open now to open the report in a new tab or select Notify when Complete to get notification. You can open the downloaded report from My Reports page.

  3. When exporting the BA Reports to Excel, note that:

    For SQL Server 2012 and later versions, the reports are exported to the Excel 2007 (.xlsx) format limiting to a maximum of 1048575 records.

    • For SQL Server versions earlier than 2012, the reports are exported to the Excel 2003 (.xls) format limiting to a maximum of 65535 records.

    For each type of analysis, there are two tabs.

    • The first tab displays information in a spreadsheet format.

    • The second tab shows the information in a chart.

The following tabs are displayed:

Tab NameDisplays
M2M DataThe raw data extracted from Made2Manage to create the procurement on-time delivery reports.
SummaryThe Procurement On-Time Delivery spreadsheet showing the average early or late delivery times by vendor name and number, as well as the fifteen parts that have the latest average delivery times by part number.
By Vendor Name ChartThe Procurement On-Time Delivery Averages by Vendor Name chart showing a graphical representation of the average variance from the expected delivery date by vendor name.
By Part Number ChartThe Procurement On-Time Delivery Averages by Part Number chart showing a graphical representation of the average variance from the expected delivery date by part number.
By Vendor Number ChartThe Procurement On-Time Delivery Averages by Vendor Num- ber chart showing a graphical representation of the average variance from the expected delivery date by vendor number.