Choose primary or critical capacity constrained resource (Advanced Scheduling only)

Article • 6/18/2026 • 1 min read

Use the CCR Selection page to manually choose the primary or critical capacity constrained resource (CCR) based on your shop floor knowledge and experience. The current CCR always displays in this window. You can use this window as an alternative to selecting the CCR with each schedule generation. Every time you change the CCR, you must update the schedule. For more information, see Related Information.

  • The CCR Selection page is only available when Advanced Scheduling is active.
  • You should only select the CCR manually if you have a good knowledge of your shop floor and want to protect a particular resource.
  • To prevent Advanced Scheduling from overwriting the CCR you selected manually, clear the Auto Set CCR check box in the Plan – Infinite page.

To choose a primary or critical capacity constrained resource

  1. Start the What-If Session.

  2. Open the CCR Selection (PSCCRSEL) page.

    • Select Scheduling > CCR Selection.

    Or

    • Search for PSCCRSEL or CCR Selection in the Navigation box and then select CCR Selection.

    The CCR Selection (PSCCRSEL) page appears.

  3. Click the Current CCR lookup reference button.

  4. Select the resource from the Lookup For Current CCR window.

Only work centers that have theCapacity Constraint check box selected in the M2M Work Centers(WORK) page are displayed.

  1. On the Toolbar, click Save.