Setting Engineering Change Management control

Article • 4/10/2026 • 1 min read

Use the Production (CSPROD) page to:

Check the ECM Control On/Off box to enable ECM control.

For any standard item, you can control changes made to its.

To manage changes in the standard bill of material or routing, you must first manage changes in the item master.