Set up Made2Manage for engineering change management

Article • 5/28/2025 • 1 min read

Engineering Change Management (ECM) manages engineering changes in standard item records. After you understand how ECM works, you can set up ECM for your company.

To set up Made2Manage for engineering change management

  1. Select the kinds of records for which you want to track changes.

  2. Turn on ECM control for all records.

  3. Turn ECM control off for individual records you don’t want to control

  4. Select the kinds of new records whose engineering changes you want to control

  5. Set override permissions for ECM control.