View an indented costed bill of material

Article • 6/30/2025 • 2 min read

Use the Indented Costed Bills of Material page to generate an indented costed Bill of Material. An indented costed bill of material details the cost of the parent part by showing the cost of each component part at each level.

Note: After you roll up costs in the Inventory Cost Roll Up (CRUP) page, the costs in the BOMICS page is displayed based on the Yields in RTG.

To generate Indented Costed Bills of Material Report

  1. Open the Indented Costed Bills of Material (BOMICS) page.

    Select Production Management > Production Reports > Boms Routings and Resources > Indented Costed Bills of Material.

    Or

  2. Search for BOMICS or Indented Costed Bills of Material in the Navigation box and then select Indented Costed Bills of Material.

    The Indented Costed Bills of Material (BOMICS) page appears.

  3. Select a component part number mentioned under Component Part No column header.

  4. You can view, add a new value or modify the existing value using the options available in the Toolbar.

  5. Change the date in the Effectivity Date box to view the bill of material for a date other than today’s date.

  6. To view the manufacturing costs for a component part, click the part in the list.

  7. To view a component part’s item master, double-click the part hyperlink in the Component Part No column to open the linked screen. The Item Master (INV) page appears.

  8. To change information about the component part, make your change in the Item Master page, and click Save, else click Cancel.

  9. On the Toolbar, click Print Indented Costed BOM.

    The Indented Costed BOM report appears in a new tab of the browser.

  10. Click the Print icon on your browser to print the report.

    Or, click the Save icon on your browser to save the report as a PDF document.