Inspection Completion

Article • 12/27/2025 • 2 min read

After completing an inspection, whether it is successful or results in a failure for a specific work order, an Inspection Result PDF document is attached. This attachment is linked to both the corresponding Work Order and the associated Equipment.

Follow-Up Information : In the event of a failed inspection result, a follow-up work order will be generated. The system adapts the creation of work orders based on whether the Standard Request (SR) is defined at the Header Level, Point Level, or Both. If the SR includes tasks or subtasks, multiple follow-up work orders will be created as shown in the table.

Header levelPoint LevelFollow up Work Order Created
SR01Not definedFSR01
Linked - SR01 actual SR data: SR01 SR01-01 SR01-01-01Not definedFSR01 FSR01-01 FSR01-01-01
Not definedSR02FSR02
Not definedLinked - SR02 actual SR data: SR02 SR02-01 SR02-01-01FSR02 FSR02-01 FSR02-01-01
SR01SR02FSR01 FSR01-01 (from point, base SR02) FSR01 FSR01-01 FSR01-01-01 FSR01-02 (from point, base SR02)
Linked - SR01 actual SR data: SR01 SR01-01 SR01-01-01SR02FSR01 FSR01-01 FSR01-01-01 FSR01-02 (from point, base SR02)
Linked - SR01 actual SR data: SR01 SR01-01 SR01-01-01Linked - SR02 actual SR data: SR02 SR02-01 SR02-01-01FSR01 FSR01-01 FSR01-01-01 FSR01-02 (from point, base SR02)